The project provides for 3 launching complexes:
1. Block A: The production building is 565.5 square meters of sandwich panels (RUUKKI). Insulated roof and walls.
Block B: 2-storey brick administrative building, including all technological and office premises. The total area of 512.1 sq.m.
2. Block B: Production building at 1291.0 square meters. The project provides for the possibility of erecting a boiler house.
3. Block D: Warehouse with an area of 635.0 square meters.
All the new external engineering networks are laid on the first launcher: water, sewerage, livnevka, central heating. Own ТП on 250кВт (but the cable is lead up to ТП on 400кВТ).
At present, the works on the first start-up complex in the amount of 75-80 percent have been completed (internal work and improvement have remained). According to preliminary calculations, the commissioning of the first start-up complex requires 150 thousand tons.
The object is preserved, there is a technical passport.
The land plot is on the right of permanent use. The right to use is bought at auction.
The plot is located 12 km. from the Minsk ring road and in 8km. from the intersection of M1-M5. The territory is completely asphalted driveways.
Contact phone for communication - + 375-29-621-02-30